A new cantilever structure was required to be designed and installed on a client’s offshore facility. This cantilever structure enabled the relocation of the office facilities and generators to make room for drilling campaigns.
As the facility was operational, no hot work was permitted and the client requested that the structure could be detatched and lifted out of position when required.